During their employment in various companies our colleagues were working as project engineers or consultants/technical supporters/software supporters on this project.
Bridge type: Composite cable-stayed bridge is a six- span, continuous superstructure with an overall length of 929 meters, with a main span of 376 m and deck width of 45 m. Steel main girder in the main span and prestressed continuous concrete girder in back span. The main support system is a single pylon with asymmetric cable-stayed structure. The pylon is 200 meters high.
Erection method: Incremental Launching Method; Segmental, balanced cantilever construction.
Involvement of our Employees: Assistance in performing the full bridge modelling, stage analysis, optimization of cable-stays stressing, structural analysis.
Reference: VCE Consult, Vienna, Austria; Bridge Designer